摘要 |
A soil moisture mapping based method for transferring soil for an earthworks construction project includes outputting signals based on soil moisture data and position data indicative of a location within a cut area or a fill area of the soil. The method further includes selecting a location within a cut area for obtaining fill soil or a location within a fill area for depositing fill soil based on the signals. A system for supplying soil for an earthworks construction project includes at least one machine having a sensor configured to sense soil moisture, and a receiver configured to receive position data corresponding with a location of the soil, and a signaling device configured to output signals based on the position data and soil moisture data. A transfer machine is included in the system and configured to selectively transfer fill soil between the cut area and the fill area based on the signals.
|