摘要 |
<p>The booth has a manual coating station(30) located beyond and close to the workpiece through-passage when viewed in the transporting direction(T) of the workpieces. The manual coating station is located upstream of a first through-passage, and an additional manual coating station(40) is provided in a second end wall downstream of a second through-passage for the workpieces. A suction pipe opens out into the interior of the booth via a suction opening below the standing base(34) in the end wall(14,20).</p> |