发明名称 |
System and method(s) of mine planning, design and processing |
摘要 |
A method of determining extraction of material from a mine having at least one pit is disclosed. The method comprises: (a) forming a block model of the pit in which material is divided into a plurality of blocks; (b) defining a plurality of clusters each comprising a plurality of blocks having a predetermined relationship; (c) determining a plurality of cones by precedent arcs extending from each cluster; and (d) defining clumps of material by the intersection of the cones so that material is extractable from the mine in a desired clump order to provide flexibility in the extraction of the material from the mine.
|
申请公布号 |
NZ539421(A) |
申请公布日期 |
2007.10.26 |
申请号 |
NZ20030539421 |
申请日期 |
2003.10.02 |
申请人 |
BHP BILLITON INNOVATION PTY LTD |
发明人 |
FROYLAND, GARY ALLAN;MENABDE, MERAB |
分类号 |
E21C41/26;(IPC1-7):E21C41/26 |
主分类号 |
E21C41/26 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|