摘要 |
A current transformer test method implemented using a test device, is useful to verify proper CT installation and operation, and does not rely on the generator (or other system) to be in a state of relatively high assembly. The test device allows a current transformer to be tested by supplying an alternating current (AC) signal to a primary winding of the current transformer to thereby induce an AC signal in a secondary winding of the current transformer. The test device is used to simultaneously monitor the phases of the supplied AC signal and the induced AC signal so that a determination can be made as to whether the current transformer secondary winding is properly installed relative to the current transformer primary winding, and to simultaneously monitor the current magnitudes of the supplied AC signal and the induced AC signal so that the turns ratio of the current transformer can be determined.
|