摘要 |
PROBLEM TO BE SOLVED: To provide a floor capable of being stuck on a slate at a plant and facilitating the construction at a site. SOLUTION: Since the floor is constituted by fittingly fixing the first base stuck on the floor surface to the second base sticking the slate on the surface, adhesion work at the site is eliminated when the slate is previously stuck on the first base. A groove is formed in a side wall of the second base, and when a connection part is inserted in the groove to enable the adjoining stone veneer floors to fix to each other, the construction is easily carried out, and since there is no displacement between the adjoining bases, unevenness is not brought on the floor surface. COPYRIGHT: (C)2006,JPO&NCIPI
|