Absorptive form wall fabricating method for building construction, involves disposing linking and reception units in mold before or after pouring concrete in mold and placing connection unit with portion, at level of reception unit
摘要
The method involves pouring concrete in a mold before or after disposing a linking unit and a reception unit (13). The concrete is dried to define a skin (2) of an absorptive form wall and the units are disposed in another mold before or after pouring another concrete in the latter mold. A connection unit (7) with a portion (9) is placed at the unit (13) and the latter concrete is dried to define a skin (3) of the wall. An independent claim is also included for an absorptive form wall.