发明名称 CONSTRUCTION METHOD FOR UNDERGROUND CAVERN
摘要 PROBLEM TO BE SOLVED: To effectively prevent natural ground from being frozen and expanded by a freezing method. SOLUTION: When an underground cavern 14 with a large cross section is constructed, a leading tunnel (roof shield tunnel 6) is arranged around a construction area, so as to form an improved zone which surrounds the construction area, and so as to form an end section-frozen zone 10 along the cross section of the construction area in the position of the end of the constriction area. The zones 10 are formed in a multiple manner at intervals in the axial direction of the construction area, and the unfrozen natural ground is left between the zones 10. A peripheral section-frozen zone 11, which surrounds the unfrozen natural ground left between the multiple end section-frozen zones, is formed integrally with the zones 10, in the state of adhering to an outer surface of the leading tunnel. COPYRIGHT: (C)2008,JPO&INPIT
申请公布号 JP2008156907(A) 申请公布日期 2008.07.10
申请号 JP20060346962 申请日期 2006.12.25
申请人 SHIMIZU CORP 发明人 YABE YUKIO
分类号 E21D9/04;E21D9/01;E21D9/06 主分类号 E21D9/04
代理机构 代理人
主权项
地址