摘要 |
In a method for laying pipes (1) in the ground (2), a hole (4) is drilled by a drill head (3) at the beginning of a pipe (1) from a starting trench ( 5) along a laying line (6) to a target trench (7), wherein the drill head (3 ) is connected via a narrow vertical connecting device (8) to a laying vehic le (9) on the surface of the site (10). The earth dislodged by the drill hea d (3) is removed from the drilled hole (4) and carried to the surface. The e nergy required for the drilling and laying process is supplied by the laying vehicle (9) and/or moving equipment (12) in the starting trench (5).
|