发明名称
摘要 <p>PROBLEM TO BE SOLVED: To shorten the period from operation until appropriate predicted value is obtained. SOLUTION: To obtain a predicted value y hat of a daily load y of an air conditioner 100, a state variable X of the air conditioner 100 is supposed and its predictor X hat is successively calculated, using a Kalman filter. Supposing that an initial value of the predictor X hat of the state variable is Xo hat, the predictor of the state variable of already operating another air conditioner 200 is adopted.</p>
申请公布号 JP4116262(B2) 申请公布日期 2008.07.09
申请号 JP20010075489 申请日期 2001.03.16
申请人 发明人
分类号 F24F11/02;G05B23/02;G06F19/00;G06Q10/04 主分类号 F24F11/02
代理机构 代理人
主权项
地址