The power plant (1) has a supply station (2), a compressor station (4) with a compressor (5), and gas turbines (8a, 8b), where a compressed gas tank is connected to the compressor. The gas turbines are temporarily fed by the gas tank. The compressor, the gas tank and the gas turbines are connected in rows, and a bridging line (10) is provided from the compressor to the gas turbines. The gas tank is parallely connected to the compressor and the gas turbines, and is formed as a pipe container (7). An independent claim is also included for a method for operating a gas turbine power plant. |