发明名称 |
CONSTRUCTION METHOD FOR GIRDER IN BRIDGE AND CRANE FOR PULLING UP GIRDER, VEHICLE FOR CARRIAGE GIRDER, GIRDER USED FOR THE SAME |
摘要 |
An installation method for a girder of a bridge for installing a girder to the upper part of a pier for forming a bridge is provided to apply to an assembling method by precast in case of a general road bridge. An installation method for a girder of a bridge comprises the steps of installing a temporary girder(200), installing a girder hoisting crane(300), manufacturing plural girders by precast, equipping a vehicle(400) for carrying a girder, carrying a first girder(100a) in a girder hoisting space of the girder hoisting crane, hoisting the first girder to the upper part, taking out the vehicle for carrying a girder backward from the girder hoisting space, moving a first temporary girder to a front piper table, and anchoring the first girder to the upper part of the piper table.
|
申请公布号 |
KR20080107085(A) |
申请公布日期 |
2008.12.10 |
申请号 |
KR20070054964 |
申请日期 |
2007.06.05 |
申请人 |
SAMSUNG C&T CORPORATION |
发明人 |
KANG, DONG OK;YOON, MAN GEUN;SHIN, HYUN YANG;KIM, YEONG SEON |
分类号 |
E01D21/00;B66C6/00;E01D2/00 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|