摘要 |
<P>PROBLEM TO BE SOLVED: To provide an assessment method for suitability of repair method of construction, a method for preparing a repair method assessment chart, and a simplified assessment method for suitability of repair method, which bring an adequate repair effect and are suitable for selecting the repair method of construction which reduces a construction cost and a maintenance/management cost. <P>SOLUTION: By the first anti-corrosion atmosphere assessment process, when the value of an assessment molar ratio R (xF, tH) is the same or more than the value of an anti-corrosion atmosphere molar ratio R0 (S14:R(xF, tH)≥R0), an anti-corrosion cross-section repair method suitable for the established content by the base establishing process for the part to be repaired and detail establishing process for the part to be repaired is adopted as a repair method for a damaged concrete construction. Also, by the second anti-corrosion atmosphere assessment process, when the value of an assessment molar ratio R (xF, tK) is the same or more than the value of an anti-corrosion atmosphere molar ratio R0 (S17:R(xF, tK)≥R0), an anti-corrosion cross-section repair method suitable for the established content by the detail establishing process for the part to be repaired and the sacrificial anode effective time establishing process is adopted as a repair method for a damaged concrete construction. <P>COPYRIGHT: (C)2009,JPO&INPIT |