发明名称 CONVERTER BLOWING SCHEDULE DECISION SYSTEM AND CONVERTER BLOWING METHOD OF STEEL USING IT
摘要 <P>PROBLEM TO BE SOLVED: To provide a converter blowing schedule decision system capable of dealing with frequent change of production amount or such troubles that production efficiency changes remarkably or falls momentarily to zero and a converter blowing method of steel using it. <P>SOLUTION: A sensor 80 generates ON and OFF signals on an electronic white board 300 by temporally tacking magnetic plates 70 having respective lengths corresponding to blowing schedule charge numbers of respective product kinds in the direction of the lapse of time in order of the product kinds to be blown. The ON and OFF signals on the electronic white board 300 are sent to a process computer 90. In the process computer 90, starting or finishing time of blowing of respective charges is predicted, and the blowing start or finishing time can be repredicted, if temporally retacking magnetic plates 70 having different lengths or temporally tacking additionally. <P>COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2008280596(A) 申请公布日期 2008.11.20
申请号 JP20070127724 申请日期 2007.05.14
申请人 JFE STEEL KK 发明人 OTANI TOSHIAKI
分类号 C21C5/28;B43L1/04;G05B19/418 主分类号 C21C5/28
代理机构 代理人
主权项
地址
您可能感兴趣的专利