发明名称 |
DYNAMIC RISK-BASED SCHEDULING TO OPTIMIZE AND INTEGRATE PRODUCTION WITH A SUPPLY CHAIN |
摘要 |
A production and inventory control for a manufacturing facility is provided that facilitates and coordinates improved planning and execution of such facility in a supply chain This may include Optimal Planning that can balance the need for low inventory, low cost (i e high utilization of equipment and labor), and efficient on-time delivery An Optimal Execution applies a dynamic policy resulting in a manufacturing system that is robust enough to accommodate moderate changes in demand and/or capacity without the need to reschedule Optimal Execution may also involve a ''Capacity Trigger'' that detects when the assumptions regarding demand and capacity used to determine the dynamic policy are no longer valid The Capacity Trigger also may provide a Trigger Signal to the planner indicating the need for either more or less capacity. |
申请公布号 |
WO2008005573(A3) |
申请公布日期 |
2008.11.20 |
申请号 |
WO2007US15677 |
申请日期 |
2007.07.06 |
申请人 |
FACTORY PHYSICS, INC.;SPEARMAN, MARK, L. |
发明人 |
SPEARMAN, MARK, L. |
分类号 |
G06Q10/00 |
主分类号 |
G06Q10/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|