摘要 |
An integrated cell construction method is provided to improve the precision of construction, to secure the stability of the cell and to improve the convenience. An integrated cell construction method comprises following steps: a first step(S10,S20,S30) making the cell of the integrated having the closed loop it unites a plurality of sheet piles in land; a second step(S40) transporting the integrated cell manufactured by land to resolution; a third step(S50) for setting up the transported cell using the pile driving machine for the location for to setting up the carried cell. |