摘要 |
<p>The coating has a number of bricks (1) arranged on a bedding layer (2) with joints (3) between adjacent bricks and at least one supporting layer (4) beneath the bedding layer. Liquid, especially rainwater, falling onto the bricks from above passes through the joints onto the bedding layer and is carried away from there. The bedding layer and/or the supporting layer are formed and/or implemented so that liquid passing into the bedding layer is carried away at least partly essentially first horizontally within the bedding layer.</p> |