A construction method of a steel composite bridge is provided to promote constructability and workability by optimizing the progress for manufacture and construction of a girder and a deck of a steel composite bridge, to make quality control easy, and to shorten the time required for manufacturing. A construction method of a steel composite bridge capable of making ultra simple construction simple comprises the steps of: manufacturing a steel girder(100) and a steel deck panel(200) in a module in a facture, and carrying and installing the steel girder and the steel deck panel in a construction site where a pier and an abutment are installed; connecting the steel girder and the steel deck panel in the vertical direction; and placing deck concrete from the upper part of the steel deck panel, and forming two side walls and a pavement layer on the top of the deck concrete.
申请公布号
KR20080093261(A)
申请公布日期
2008.10.21
申请号
KR20070036963
申请日期
2007.04.16
申请人
SOKTOPENG CO., LTD.;INDUSTRY-UNIVERSITY COOPERATION FOUNDATION SUNMOON UNIVERSITY
发明人
LEE, SON HO;YOON, KI YONG;KIM, SANG SEUP;PARK, JEONG UNG;PARK, JONG SUP;PARK, YOUNG SOO