CONTINUOUS COMPOSITE BRIDGE CONSTRUCTION METHOD |
摘要 |
A continuous construction method of a steel composite bridge is provided to construct a bridge economically by using section steel as a steel girder for constructing a steel composite bridge, to minimize the flexural negative moment occurring on a support such as a pier, to make long-span construction possible if steel girders have the same cross sectional size, and to have the smaller girder height in case of the same span. A continuous construction method of a steel composite bridge comprises the steps of: installing a bridge bearing to a pier(400), which is a lower structure of a bridge, to support a horizontal steel girder, and installing a horizontal steel girder to the top of the bridge bearing; manufacturing a vertical girder(100) composed of a steel girder and a steel deck panel in a module in a factory, and installing the steel girder and the steel deck panel in a construction site where a pier and an abutment are installed by arranging two steel girders at regular intervals and unifying a steel deck panel on the upper part of each steel girder using a fastener composed of a connecting bolt and a nut; fixing the vertical girder on the upper part of the horizontal steel girder; placing deck concrete on the upper part of the steel deck panel; and continuing the vertical girders fixed to the upper part of the horizontal steel girders. |
申请公布号 |
KR20080093263(A) |
申请公布日期 |
2008.10.21 |
申请号 |
KR20070036965 |
申请日期 |
2007.04.16 |
申请人 |
SOKTOPENG CO., LTD.;INDUSTRY-ACADEMIC COOPERATION FOUNDATION, CHOSUN UNIVERSITY |
发明人 |
LEE, SON HO;YOON, KI YONG;KIM, SANG SEUP;PARK, JEONG UNG;PARK, JONG SUP;CHO, YUN JAE |
分类号 |
E01D2/02;E01D21/00 |
主分类号 |
E01D2/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|