发明名称 COMBINED POWER PLANT
摘要 PROBLEM TO BE SOLVED: To provide a combined power plant capable of shortening the starting time. SOLUTION: The combined power plant comprises a gas turbine 19, a steam turbine 23, a steam supply unit 9 for supplying steam to the gas turbine 19, a first steam pipe 11 for leading steam from the steam supply unit 9 to the gas turbine 19, a second steam pipe 13 for leading steam from the gas turbine 19 to the steam turbine 23, first emission units 39, 41, 43, 45 for controlling the supply destination of the steam lead by the first steam pipe 11 to any one outer part of the gas turbine 19 and the first steam pipe 11, second emission units 51, 53, 55, 57 for controlling the supply destination led by the second steam pipe 13 to any one outer part of the steam turbine 23 and the second steam pipe 13, and a bypass pipe for leading at least a part of steam in the first steam pipe 11 to the second steam pipe 13 between the gas turbine 19 and the second steam pipe 13. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2008248730(A) 申请公布日期 2008.10.16
申请号 JP20070088748 申请日期 2007.03.29
申请人 MITSUBISHI HEAVY IND LTD 发明人 KITAGUCHI YOSHINORI
分类号 F01K23/10;F01D25/10;F01D25/12;F02C6/18;F02C7/18;F22B1/18 主分类号 F01K23/10
代理机构 代理人
主权项
地址