摘要 |
A method of cementing an off bottom liner including the steps of establishing a first flow blockage in the liner at a location down-hole of a cementing valve located in the side wall of the liner, opening the cementing valve which exposes openings in the sidewall of the liner, pumping cement down the liner and out through the openings in the sidewall of the liner, establishing a second flow blockage up-hole of the cementing valve, closing the cementing valve, opening the second flow blockage to establish fluid communication through the second flow blockage, and opening the first flow blockage to establish fluid communication through the first flow blockage. The steps of opening the first and second flow blockages are achieved by increasing the pressure in the liner above the blockages. In this way, it is possible to cement an off bottom liner and regain fluid communication to the wellbore below the liner without the need for any drilling operations.
|