发明名称 |
THE CHANNEL CULVERT SCOUR PREVENTION STRUCTURE AND THE METHOD OF CONSTRUCTION FOR WHICH PRECAST CONCRETE BLOCK WAS USED |
摘要 |
A scour prevention structure for a channel culvert using precast concrete blocks is provided to prevent scour of the channel culvert by connecting precast concrete blocks comprising base blocks and finishing blocks with one another. A scour prevention structure for a channel culvert(C) using precast concrete blocks(B) comprises base blocks(10) and finishing blocks(30). The base blocks are accumulated on the bottom of the channel culvert. Formed like a triangle, the finishing blocks are located at the end of the base blocks and face the channel culvert. Each base block is provided with a square cavity formed from the top to the bottom. |
申请公布号 |
KR20080090742(A) |
申请公布日期 |
2008.10.09 |
申请号 |
KR20070033937 |
申请日期 |
2007.04.06 |
申请人 |
JINHWA CONSULTING ENGINEERING CO., LTD. |
发明人 |
YOO, UNG JUN;JUNG, JAE YUN |
分类号 |
E02B5/00 |
主分类号 |
E02B5/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|