发明名称 METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT
摘要 FIELD: mining. ^ SUBSTANCE: method involves positioning injection wells between production wells at the distance of 30-250 m between wells. Injection well bottom is positioned at 5-7 m distance from productive formation bottom. Production well bottom is positioned at 0.5-1.5 m distance from productive formation bottom. The wells are perforated at 0.6-1.0 m interval from the bottom. Steam alternated with air is used as heat carrier. Heat carrier is pumped over injection wells, and oil is withdrawn over production wells. ^ EFFECT: increased oil yield of a pool. ^ 1 ex, 1 dwg
申请公布号 RU2334097(C1) 申请公布日期 2008.09.20
申请号 RU20070135245 申请日期 2007.09.24
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D. SHASHINA 发明人 KHISAMOV RAIS SALIKHOVICH
分类号 E21B43/24 主分类号 E21B43/24
代理机构 代理人
主权项
地址