摘要 |
PROBLEM TO BE SOLVED: To provide a building construction method, constructing aerial structures of two or more stages at spaces in the direction of height of a building block between two or more blocks of buildings, and having excellent economic efficiency. SOLUTION: Concurrently with the process of performing skeleton construction for two or more building blocks 1, 1, up to a first construction level H<SB>1</SB>of the aerial structure 10 of the first stage, the principal part 10a of the aerial structure of the first stage is built at the bottom between the building blocks, the principal part 10a is elevated to the construction level H<SB>1</SB>and fixed to the skeleton of the building block. Concurrently with the process of performing skeleton construction up to a second construction level H<SB>2</SB>of the aerial structure 20 of the second stage, the principal part 20a of the aerial structure 20 of the second stage is built on the aerial structure 10 of the first stage, the principal part 20a is elevated up to the second construction level H<SB>2</SB>, and fixed to the skeleton of the building blocks 1, 1. These processes are repeatedly performed according to the number of stages of the aerial structures to be constructed. COPYRIGHT: (C)2008,JPO&INPIT
|