发明名称 |
CALCULATION APPARATUS, PROGRAM, CALCULATION SYSTEM AND CALCULATION METHOD FOR DRAFTING PRODUCTION PLAN |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a technique capable of drafting a flexible production plan matching the circumstances of the production demand. <P>SOLUTION: An available production quantity calculation part for implementing material requirements planning for computing an available production quantity and a production availability date for production request information having at least one production request specifying a requested production quantity; a requested production date and a priority level for a type of product computes the available production quantity and production availability date as delaying the requested production date by a plurality of methods, if determining that the requested production quantity in one production request cannot be produced by the requested production date in the one production request. A display information generation part then creates image data that list the available production quantities and the production availability dates computed by the plurality of methods. <P>COPYRIGHT: (C)2008,JPO&INPIT</p> |
申请公布号 |
JP2008204082(A) |
申请公布日期 |
2008.09.04 |
申请号 |
JP20070038250 |
申请日期 |
2007.02.19 |
申请人 |
HITACHI LTD |
发明人 |
UENO HIDENORI;KANEKO HIROYUKI |
分类号 |
G05B19/418;G06Q50/00;G06Q50/04 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|