发明名称 |
NATURAL GROUND STABILIZING METHOD, NATURAL GROUND STABILIZING STRUCTURE, FILLER, METHOD FOR FORMING SPACE IN NATURAL GROUND, TUNNEL CONSTRUCTION METHOD USING JACKING METHOD, TUNNEL CONSTRUCTED BY THIS METHOD, TUNNEL CONSTRUCTION METHOD BY SHIELD MACHINE, TUNNEL CONSTRUCTED BY THIS METHOD, DRAIN WELL CONSTRUCTION METHOD FOR DRAINING CONFINED GROUND WATER AND DRAIN WELL FOR DRAINING CONFINED GROUND WATER |
摘要 |
PROBLEM TO BE SOLVED: To provide a natural ground stabilizing method, a stabilizing structure and a filler used therefor, capable of holding and stabilizing the natural ground when forming a space or a void in the natural ground. SOLUTION: This filler 11 being a solid state at the ordinary temperature in the natural ground 13 and becoming a fluid state when becoming the predetermined temperature higher than the ordinary temperature, is filled in the fluid state in a void part 9 formed in the natural ground 13 by a drilled hole of a hole by a hole drilling machine such as a shield machine 1 and a pipe jacking machine 2. The filler is cooled, and becomes the solid state, and holds the natural ground 13, and prevents collapse of the natural ground 13. COPYRIGHT: (C)2008,JPO&INPIT |
申请公布号 |
JP2008169683(A) |
申请公布日期 |
2008.07.24 |
申请号 |
JP20070164027 |
申请日期 |
2007.06.21 |
申请人 |
OHBAYASHI CORP |
发明人 |
FUKUMOTO KATSUJI;MIKI KEIZO;UEDA JUN;MATSUMOTO SHIN;YAMAMURO HODAKA;KOYANAGI KOJI;SASAKI HIROTAKA |
分类号 |
E21D11/00;E21D9/06 |
主分类号 |
E21D11/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|