摘要 |
A ground improvement method of dredging soil is provided to shorten compacting period of a dredging soil reclaiming land by draining water in the dredging soil through a perforated pipe. A ground improvement method of dredging soil includes the step of: installing a perforated pipe(20) on the ground on which the dredging soil is reclaimed before reclaiming the dredging soil. The perforated pipe is fixed to the ground by supports(60) to prevent the perforated pipe from moving out of its place. |