摘要 |
Method for dump formation includes advancing taking off for fertile soil layer within boundaries of land allotment of dump, construction of embankment with height equal to height of dump level, formation of outer slant of level, piling opening rocks to center of dump, filling second level of dump with filling first level. Outer slants are formed at angle of natural slant of dump rocks. The slants are covered with grass carpets, and on terraces one forms trenches with depth 1.0 m in parallel to edges of slants of levels, those are filled with mix of dry deposits of sewage waters and clay. |