摘要 |
PROBLEM TO BE SOLVED: To provide a steel retaining wall which is more stable than a retaining wall formed of gabions, facilitates surface compaction of earth etc., and can be constructed more easily than a geogrid reinforced soil wall. SOLUTION: The retaining wall is constructed by stacking steel forms in multiple stages. Each steel form consists of a front mesh plate and a bottom mesh plate, and is formed in L-shape in cross section. The bottom mesh plate has a depthwise length at least 1.5 times or more a height of a vertical front mesh plate, and both the front mesh plate and the bottom mesh plate are connected together by diagonal ties to retain the L-shape. Thus the multi-stage stacking retaining wall is obtained by employing the steel forms. COPYRIGHT: (C)2008,JPO&INPIT
|