发明名称 |
GROUND IMPROVEMENT METHOD |
摘要 |
PROBLEM TO BE SOLVED: To provide a ground improvement method, restraining uplift of ground and securing a desired improvement effect. SOLUTION: This ground improvement method includes: a drilling process S1 of making a bore hole to a predetermined depth; a capillary insertion process S2 of inserting a capillary into the bore hole; an unsaturation process S3 of injecting bubbles from the tip of the capillary into the ground to previously unsaturate the ground to be improved; and a consolidated body forming process S4 of injecting solidifying material from the bore hole to form a consolidated body. COPYRIGHT: (C)2008,JPO&INPIT
|
申请公布号 |
JP2008115638(A) |
申请公布日期 |
2008.05.22 |
申请号 |
JP20060301138 |
申请日期 |
2006.11.07 |
申请人 |
PORT & AIRPORT RESEARCH INSTITUTE;ZEN KOUKI;SANSHIN CORP;MIRAI KENSETSU KOGYO KK;FUKKEN CO LTD CONSULTING ENGINEERS;MIRAI GEO-TECH KK |
发明人 |
YAMAZAKI HIROYUKI;ZEN KOUKI;NIIZAKA TAKASHI;KONISHI TAKESHI;ADACHI MASAKI;FUJII TERUHISA;TAKAHASHI TADASHI |
分类号 |
E02D3/12;E02D3/08;E02D27/34 |
主分类号 |
E02D3/12 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|