摘要 |
A method for manufacturing a toothing on a component of a shaft/hub connection is disclosed. The component may be held permanently in a chucking while it receives an at least two-stage toothing in this chucking. A special draw die for carrying out the method is also proposed, a first toothing-forming region with a first height and at least one following second toothing-forming region with at least one second height being arranged between a first and a second end face, and the first height being designed to be lower than the second height. |