发明名称 CONSTRUCTION METHOD FOR IMPERVIOUS WALL
摘要 PROBLEM TO BE SOLVED: To keep the performance of an impervious wall proper by infilling an impervious material into a joint portion in which steel sheet piles are erected in line, when controlled-type revetment is constructed by erecting the impervious wall. SOLUTION: When the controlled-type revetment is constructed, the impervious material is infilled into an internal space 21 in a connecting portion between sheet pile walls 15 in which the steel sheet piles 20 are erected in line, so that imperviousness to water can be maintained in the joint portion. When the impervious material is infilled, a perforated pipe 22 is prearranged, so that impurities such as water can be moved upward from below, as the impervious material is infilled. Thus, the water and the like are prevented from remaining by being sealed in the lower portion of the impervious material and an impervious material layer. COPYRIGHT: (C)2008,JPO&INPIT
申请公布号 JP2008106459(A) 申请公布日期 2008.05.08
申请号 JP20060288164 申请日期 2006.10.24
申请人 WORLD ENGINEERING KK;NIPPON ROAD CO LTD:THE;TAISEI ROTEC CORP;NIPPON KAIJO KOJI KK 发明人 WAGI TAKATSU;ORIGASA MASAMI;NONODA MITSURU;KOBAYASHI AKINORI;YAMASHITA YOSHIHARU;NAKANO HIROSHI;OBUCHI SHOICHIRO
分类号 E02D5/04;E02B3/16 主分类号 E02D5/04
代理机构 代理人
主权项
地址