摘要 |
<P>PROBLEM TO BE SOLVED: To provide a method for generating a test signal for testing the accuracy of the CINR measurement of a subscriber station through a base station emulator with which a trigger line for synchronization and a combiner are not necessary and the costs of the establishment of a test environment can be reduced. <P>SOLUTION: The method includes a step (a) of reading preamble data corresponding to a predetermined cell ID from a code table, and taking it as desired preamble data, a step (b) of generating signal data such as desired pilot data and various information data, a step (c) of reading preamble data corresponding to remaining cell IDs from the code table, and taking the preamble data as interference preamble data, a step (d) of generating interference pilot data, and a step (e) of generating test signal data by adding the interference preamble data and the interference pilot data generated in the steps (c) and (d), respectively to the desired signal data generated in the step (b). <P>COPYRIGHT: (C)2008,JPO&INPIT |