摘要 |
The supply line (10) has a supply connection on the conveyor (2) side for connection to the supply system (5) and a connection on the hydraulic mine support (3,4) side at a distance from the supply connection for connection to the supply connection via an inner channel. A cylindrical tube (20) and a telescopically guided piston arrangement within it form the variable length inner channel. |