摘要 |
A method for scheduling a plurality of virtual machines includes: determining a resource requirement (X<SUB>i</SUB>) for each virtual machine (VM); determining an interrupt period (Y<SUB>i</SUB>) for each VM; and scheduling the plurality of VMs based, at least in part, on each respective X<SUB>i </SUB>and Y<SUB>i</SUB>.
|