摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a culture schedule-managing device preventing the contamination with high safety, and automatically forming a culture schedule of a large number of cultured cells per operation space. <P>SOLUTION: The managing device of the culture schedule has a means for setting a schedule time of the practice of each process from the starting time of the culture and a standard schedule, a means for selecting the earliest process from processes of which the practice times and practice operation spaces are not determined, a means for judging whether an empty operation space is present or absent at the schedule time of the practice of the selected process, a means for judging whether the practice of the process is required or not from the importance of the process when the empty operation space is absent, and a means for determining that the process is not put into practice when the practice of the process is not required. <P>COPYRIGHT: (C)2008,JPO&INPIT</p> |