摘要 |
Assembling/inspecting equipment for a fuel cell comprises a first base pl ate for mounting a fuel cell stack including a current collecting plate plac ed on a first end plate and a plurality of unit cells stacked on the current collecting plate, and a pressure cylinder for pressing the stack, and the e quipment assembles a fuel cell by fixing a second end plate to a pressed sta ck. The equipment is provided with fuel gas supply piping, fuel gas discharg e piping, oxidizing agent gas supply piping, oxidizing agent gas discharge p iping, cooling medium supply piping, and cooling medium discharge piping. Th e pipings are connected, respectively, with a fuel gas supply port, a fuel g as discharge port, an oxidizing agent gas supply port, an oxidizing agent ga s discharge port, a cooling medium supply port, and a cooling medium dischar ge port, which are provided on the first end plate. |