发明名称 |
Method for starting power station installation in deactivated electricity network, involves forming connection between generator of pressure store-relaxation turbine and start device of gas turbine group |
摘要 |
<p>A method for starting a power station installation in a deactivated electrical network, in which the power station comprises a pressurized air store (201) and a pressure store-relaxation turbine (203) and a gas turbo group (1). The procedure comprises opening a storage fluid mass flow adjustment element (7) and taking a storage fluid mass flow out of the pressurized air store. The storage fluid mass flow is then relaxed in the pressure store-relaxation turbine by generating a shaft output and then driving the generator (204) with the generated shaft output and generating a first electrical output. A connection is formed between the generator (204) and pressure store-relaxation turbine and a start device (22) of the gas turbine group. The gas turbo group is then started with the electrical power generated by the generator of the pressure store-relaxation turbine. An electrical connection is then made between the power station installation and the electricity network. An independent claim is also included for a power station installation.</p> |
申请公布号 |
CH696980(A5) |
申请公布日期 |
2008.02.29 |
申请号 |
CH20030002207 |
申请日期 |
2003.12.22 |
申请人 |
ALSTOM TECHNOLOGY LTD |
发明人 |
ALTHAUS DR. ROLF |
分类号 |
F02C7/26;F02C6/16;F02C7/08 |
主分类号 |
F02C7/26 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|