发明名称 Method for building a diaphragm wall in the ground and trench wall cutting apparatus
摘要 <p>A method for preparing underground slit walls has a slitting head (10) comprising a support frame (10) with one or two rotating cutting discs (12, 12') lowered into the ground by a telescopic support. The slitting head removes materials from under the head and the spoil is directed to the void above the head. At the same time a binding fluid is injected into the spoil via a duct (41) terminating at the slitting head. The slit is cut by repeated raising and lowering of the slitting head, which mixes the setting fluid with the spoil. The spoil and setting fluid set eventually to form the slit wall.</p>
申请公布号 SI1452645(T1) 申请公布日期 2008.02.29
申请号 SI20040030490T 申请日期 2004.01.15
申请人 BAUER MASCHINEN GMBH 发明人 ARZBERGER MAXIMILIAN DIPL.-ING (FH)
分类号 E02F5/08;E02D5/18;E02D5/20;E02D17/13;E02F3/20;E02F5/02;E21B10/08 主分类号 E02F5/08
代理机构 代理人
主权项
地址