发明名称 J.K BRACKET METHOD
摘要 A method for lifting a slab of a bridge by using a high tension steel rod and an assembly steel bracket is provided to guarantee great amount of supporting force without damaging the bridge by burying a high tension steel rod at an upper surface of the bridge. A method for lifting a slab(13) of a bridge(12) comprises the steps: forming a block out by digging a coping upper surface of the bridge until an inner steel exposes; installing at least two hollow steel pipes(40) on a block out surface to allow a nut(41) to direct upwards; returning the coping surface by pouring a non-contracted mortar on the blockout surface; inserting a high tension steel rod(50) into the hollow steel pipes to conform a bolt fixing groove to the nut; inserting a fixing bolt(55) from an upper part of the coping surface and adhering to the bolt fixing groove; installing an assembly steel bracket(70) at an end of the high tension steel rod; putting the assembly steel bracket on a jack supporting plate and balancing the jack supporting plate; and lifting the slab of the bridge by using an oil jack(30) placed on the jack supporting plate.
申请公布号 KR20080017240(A) 申请公布日期 2008.02.26
申请号 KR20070035369 申请日期 2007.04.11
申请人 SHINHWA M&C CO., LTD. 发明人 HAN, JUNG KOO
分类号 E01D22/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址