发明名称 I-BEAM SEGMENT CONSTRUCTION BRIDGE CONNECTION METHOD WHICH INCREASED IN JUNCTION STIFFNESS
摘要 A method for connecting I-beam segments of a temporary bridge with improved stiffness in a connection is provided to keep stiffness in a connection of the existing I-beam segments, to prevent a deck plate put on an upper flange of I-beam segments of a temporary bridge from projecting to a connection of I-beam segments and to keep at a level, and to prevent I-beam segments from being damaged when disconnecting I-beam segments of a temporary bridge. A method for connecting I-beam segments(10) of a temporary bridge(B) with improved stiffness in a connection comprises the steps of welding straight or square steel plates on right and left sides of the top of a web(20) in the vicinity of a connection(16) of the I-beam segments using connecting auxiliary flanges(30b), and adding connecting steel plate(18) on upper and lower sides of the auxiliary flanges and fixing with high tension bolts(32), wherein the auxiliary flange of the straight steel plate is not connected with an upper flange(12) and the auxiliary flange of the square steel plate is connected with the upper flange.
申请公布号 KR100804046(B1) 申请公布日期 2008.02.18
申请号 KR20070127393 申请日期 2007.12.10
申请人 NO, YUN KEUN;NO, YOK GEUN;NO, SIL GEUN 发明人 NO, YUN KEUN;NO, YOK GEUN;NO, SIL GEUN
分类号 E01D21/00;E01D2/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址