摘要 |
<p>According to the method according to the invention, a flushing device is first connected to the building structure. In this case, at least one flushing duct and at least one suction duct extend as far as underneath the bottom of the building structure. The building structure is positioned on the ground at a suitable location, for example at ground level or in a hole in the ground. Via the flushing duct, a flushing liquid, for example water or bentonite, is conducted to the ground below the bottom of the building structure. The ground will mix with the flushing liquid, following which the flushed ground can be sucked up via the suction duct from underneath the bottom of the building structure. Several foundation means are introduced into the ground around the building structure. The building structure is provided with various coupling points in order to couple the building structure to the foundation means. It is characteristic of the method according to the invention that, when the building structure has been introduced into the ground at a desired depth, the coupling points are higher than the distal ends of the fitted foundation means. As a result thereof, the foundation means will be able to exert a vertical force component on the building structure.</p> |
申请人 |
RIES HOLDING B.V.;VAN LEEUWEN, MARINUS, TEUNIS, SR. |
发明人 |
VAN LEEUWEN, MARINUS, TEUNIS, SR. |