发明名称 |
TUNNEL CONSTRUCTION METHOD |
摘要 |
PROBLEM TO BE SOLVED: To provide a tunnel construction method shortening a construction period and considerably reducing a construction cost with safe and efficient construction work in uniting a vertical shaft and an underground tunnel. SOLUTION: The tunnel construction method comprises a vertical shaft construction process for sinking a vertical shaft wall surface member down to a support layer and sinking a machinable member machinable by a succeeding side shield machine instead of a normal vertical shaft wall surface member, as the vertical shaft wall surface member located at a branch junction part; an inside buried material filling process for filling an inside buried material in the branch junction part on the vertical shaft side; a succeeding tunnel penetration construction process for advancing for excavation while constructing a succeeding tunnel and cutting the inside buried material and the machinable member on the vertical shaft side to carry out intersecting penetration into the vertical shaft; a natural ground improving process for improving the natural ground around the branch junction part; and a wall surface communicating process for allowing the intersecting wall surfaces on the vertical shaft side and the succeeding tunnel side to communicate with each other. COPYRIGHT: (C)2008,JPO&INPIT
|
申请公布号 |
JP2008019663(A) |
申请公布日期 |
2008.01.31 |
申请号 |
JP20060193765 |
申请日期 |
2006.07.14 |
申请人 |
MAEDA CORP;SHIMIZU CORP;HAZAMA CORP |
发明人 |
NODA KENJI;MIYAZAWA MASAHIRO;KUHARA TAKASHI;TAKENOUCHI YASUAKI;FUJIMOTO AKIO |
分类号 |
E21D9/00;E21D11/08 |
主分类号 |
E21D9/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|