摘要 |
<p>The system (1) has a central computer (2). Periphery computers of energy (5), maintenance (5.1), material (5.2), manufacturing (5.3), administration (5.4) and selling (5.5), receive, evaluate or forward the work process data resulting from the assigned cost points of energy (4), maintenance (4.1), material (4.2), manufacturing (4.3), administration (4.4) and selling (4.5) to the central computer in the required condition. The evaluation or analysis of the data or a comparison with planning data is automatically done by balance periphery computer (8) attached to the central computer.</p> |