发明名称 A METHOD OF LAYING PLANS FOR A MIDDLE SCHEDULE FOR A SHIP PRODUCTION
摘要 A method of establishing a medium term schedule plan system for ship production is provided to maintain consistency of a ship-ticketing plan and a short and medium term plan by establishing systematic standard and process for production plan establishment; build an organization undertaking the production plan from the integrated view; introduce a tool which can analyze a load by considering all kinds of contract stipulations by industry or occupation; establish a production plan system which can analyze a load by considering all kinds of contract stipulations by industry or occupation; build a process which analyzes capacity before and after facility investment and the capacity variation trend connected to the existing facilities; distribute productions by stage reasonably by fractionating a work management unit(WBS system establishment); build a process reflecting an production output by a type of ship; establish the monitoring system and structure of the production output; make the work standardization system, such as work manual or management protocol; and have modification, additional analysis and feedback process. A method of establishing a medium term schedule plan system for ship production follows procedure for a leading-embarkation schedule plan. The procedure includes the following steps: a step which inquires and adjusts the schedule of leading-embarkation block; a step which inquires and adjusts a load according to the leading-embarkation schedule plan; and a step which examines and decides the adjusted leading-embarkation schedule plan.
申请公布号 KR20080004250(A) 申请公布日期 2008.01.09
申请号 KR20060063022 申请日期 2006.07.05
申请人 STX SHIPBUILDING CO., LTD. 发明人 SHIN, SANG HO;CHO, JAE HONG;KIM, YOUNG TAE;LEE, YOUNG HUN
分类号 G06F17/00 主分类号 G06F17/00
代理机构 代理人
主权项
地址