发明名称 CONSTRUCTION METHOD OF TUNNEL HAVING PARALLEL TUNNEL
摘要 PROBLEM TO BE SOLVED: To reduce construction cost and shorten the period of construction by reducing the excavation section of a parallel tunnel such as a sidewalk to a minimum necessary size. SOLUTION: In the tunnel construction method for constructing a tunnel lining structure 2 by inserting lining elements 3 in parallel to the natural ground prior to tunnel excavation, an upper floor slab 4 is formed to extend horizontally from a side wall slab 5, and a guide pipe 14 is set in a lower natural ground position apart from an end element 3e of the extension part 7 by a predetermined distance. After the upper floor slab 4 and the side wall slab 5 are constructed, a pulley support mechanism supporting a cutting pulley is stowed in the end element 3e and the guide pipe 14, and the natural ground between the end element 3e and the guide pipe 14 is cut by a flexible cutting tool such as a wire saw wound on the cutting pulley, a protective plate 8 is inserted to the cut part, and the inside natural ground partitioned by the protective plate 8, the extension part 7 and the side wall slab 5 is excavated to construct the side tunnel 10. COPYRIGHT: (C)2008,JPO&INPIT
申请公布号 JP2007332734(A) 申请公布日期 2007.12.27
申请号 JP20060168993 申请日期 2006.06.19
申请人 EAST JAPAN RAILWAY CO;TEKKEN CONSTR CO LTD;JEITEKKU:KK 发明人 SHIMIZU MITSURU;FURUYAMA SHOICHI;TAKAGI YOSHIMITSU;TAKIUCHI YOSHIO;MORI MASANORI;NAKAJIMA SATOSHI;SATO EITOKU;NAGAO TATSUJI;HAGIWARA YOSHIO;MAEDA TOMOHIRO;NAGAOKA TAKASHI;WATANABE HATSUO
分类号 E21D9/04 主分类号 E21D9/04
代理机构 代理人
主权项
地址