A construction method and a construction method of an artificial mat are provided to use an artificial mat for a long time by constructing the artificial mat on the ground of a reservoir firmly without floating. A construction structure of an artificial mat for constructing an artificial mat(130) with artificial piles(131) on the ground where an aggregate layer(110) and a stone powder layer(120) are piled up in order includes an anchor inserted to the aggregate layer not to be floated by earth pressure, a pressure body(150) provided at the top of the artificial mat, and a wire(W) connecting the anchor and the pressure body tensely via the artificial mat, so that the artificial mat is constructed on the ground of a reservoir firmly. A construction method of the artificial mat structure comprises the steps of: placing anchors fixed with a wire on the ground of a reservoir; forming a concrete layer by placing concrete on the ground to bury the anchors with the wire; setting artificial piles on the concrete layer and placing an artificial mat with through holes(130a); placing pressure bodies on the top of the artificial mat and drawing out the wire exposed to the top of the concrete layer through the through holes of the artificial mat, and then connecting with the pressure bodies tensely; and cutting off the wire exposed to the top of a fixing clip(152) of the pressure body and placing fillers composed of sand and rubber chips between the artificial piles of the artificial mat. |