发明名称 |
FURNACE OPERATION CONTROL METHOD AND DEVICE |
摘要 |
PROBLEM TO BE SOLVED: To provide a furnace operation control method capable of setting a numerical value of appropriate parameter to a furnace for drying or burning a large panel more quickly in comparison with a conventional method. SOLUTION: A model panel 6 coated with an evaporative material is set in an experiment unit 5 independent from a controlled furnace 1, an actual evaporation quantity change characteristic Gs of the evaporative material is calculated by actually measuring the evaporation quantity of the evaporative material, a calculatory time required for evaporation ts for evaporating the evaporative material of a heated panel 2 by a target evaporation quantity is calculated by using the actual evaporation quantity change characteristic Gs, and the numerical value of the parameter of the controlled furnace 1 is changed to make the time required for evaporation ts approaches a target time tr. COPYRIGHT: (C)2008,JPO&INPIT
|
申请公布号 |
JP2007303728(A) |
申请公布日期 |
2007.11.22 |
申请号 |
JP20060132045 |
申请日期 |
2006.05.11 |
申请人 |
MATSUSHITA ELECTRIC IND CO LTD |
发明人 |
MATSUDA NAOKO;NAKA HIROYUKI;YOSHIDA MASARU |
分类号 |
F26B21/06;F26B3/04;F26B9/06;F27D19/00;H01J9/227 |
主分类号 |
F26B21/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|