摘要 |
<p><P>PROBLEM TO BE SOLVED: To suitably air-condition a habitable space even in a room where a ceiling is positioned higher than the installed position of an air conditioner. <P>SOLUTION: The air conditioner 1 is installed on a wall surface 43A at the center and half height thereof. A projected part 21 playing the role of an air guide member is formed on the wall surface 43A above 0.4m from the top end of the air conditioner 1. When the air conditioner 1 is operated, as shown by an arrow A, a blow air flow sent from a blow port 11 flows along the lower surface of the projected part 21 and then flows toward a wall surface 43B on the opposite side thereof. Since a suction air flow to a suction air port 12 is limited to a flow flowing from both sides of the air conditioner 1, as shown by an arrow B, by the presence of the projected part 21, the conventional short-circuit of blow air flow does not occur. According to these blow air flow (arrow A) and suction air flow (arrow B), a flow circulating the entire part of the inhabitable space 5 shown by an arrow C can be realized. <P>COPYRIGHT: (C)2004,JPO</p> |