摘要 |
PROBLEM TO BE SOLVED: To provide an eave end roof tile which is not damaged by the slip etc. of snow, and which enables rainwater to be surely poured into an eaves gutter. SOLUTION: A tile 10 is provided at the edge 20a of eaves. In the tile 10, a weir part 12 for receiving rainwater flowing down on a tile surface of the tile 10 is provided in the state of being directed to the width side of a head part 10a, and a plurality of rainwater flow-down holes 13 are provided along the weir part 12. The rainwater can be poured into the eaves gutter 30, which is provided below the tile 10, from the hole 13. COPYRIGHT: (C)2008,JPO&INPIT
|