摘要 |
Method for abandoning or recovering a load, typically a pipeline or sub-sea structure, at sea, using a multi-cable assembly with at least two cables for lowering, respectively raising a load during abandonment, respectively recovery of a load, wherein the traction in each of said at least two cables is adjusted in function of the desired rotation of the load end of the multi-cable assembly.
|